NCC 2025 · Australia

AI NCC 2025 compliance checking for Australian projects

UptoCode reads your construction drawings and BIM models and checks them against the National Construction Code, returning a report where every finding is cited to the clause.

Built for how NCC checking actually works

As the NCC 2025 edition rolls out across Australian states and territories, checking a project against it is still mostly manual: a reviewer opens the drawings, opens the Code beside them, and works clause by clause. It is slow and easy to miss something.

UptoCode reads your drawings and BIM models the way a reviewer would, then checks them against the NCC provisions you care about. Every result is cited back to the clause and the drawing, so you can verify it in seconds instead of hunting through the Code.

What you can check against the NCC

UptoCode checks against the provisions in the regulation you upload. Common NCC areas include:

Fire safety & resistance

Fire-resistance levels, separation, and the fire provisions in the regulation you upload.

Egress & exits

Exit travel distances, door and corridor widths, and access to exits against the relevant clauses.

Energy efficiency

Energy-efficiency provisions, including the NCC 2025 housing energy and NatHERS-style requirements.

Access & livability

Accessibility and Livable Housing design requirements as they apply to your project type.

Wet areas & weatherproofing

Waterproofing of wet areas and weatherproofing of the building envelope.

Ventilation & condensation

Ventilation and condensation-management provisions introduced and refined in recent NCC editions.

You can also upload your own QA standards, state variations, or council requirements and check against those the same way.

Who uses it

Building surveyors & certifiers running pre-submission checks before they sign off.

Architects & designers catching NCC issues before drawings leave the studio.

Builders validating documentation before construction starts.

Councils & authorities speeding up DA and assessment workflows.

How it works

1

Upload

Your drawing set or BIM model, plus the NCC volume or section you want to check against (or let UptoCode source it).

2

AI analysis

UptoCode extracts dimensions, materials, fire ratings and more, then cross-references them against the NCC clauses.

3

Cited report

A pass/fail result per requirement, each cited to the NCC clause and the drawing or element it came from.

New to AI code checking? Read the guide to how AI checks drawings and BIM, see BIM & IFC compliance checking, or view pricing.

End-to-end encryptedZero training on your data

Check your next project against the NCC

Upload your drawings free and read a cited NCC compliance report in minutes. No credit card required.

No credit card required65 free creditsFull platform access